Central assumptions supported by the available evidence.
Five assumptions to challenge. Transparent calculations, interpreted gaps and evidence to request before deciding.
Five independent educational exercises. Results are simulations using fictional data, never realised client benefits. They are not recommendations on a real investment.
A reassuring annual average can conceal a more demanding peak over the project horizon.
The projection adds approximately 946 orders to the reference peak. Capacity needs to be tested over this horizon, with a documented mix and seasonality.
The sensitivity changes one input only; all other assumptions remain constant.
The inputs above describe the initial scenario. The slider value and calculation below describe the sensitivity currently displayed.
Annual volume = 1,000,000 × 1.05³ = 1,157,625 orders. Average = 4,630.5/day. Peak = 4,630.5 × 1.5 = 6,945.75/day. Gap = 6,945.75 − 6,000 = +945.75 orders/day.The peak factor is an assumption. This simplified projection does not reproduce the full mix or seasonality.
Before sizing the equipment, reconcile the projection with commercial data and peak periods. Test lower and higher growth.
Check service performance during peaks.
Avoid sizing against unsupported demand.
Anticipate when capacity will be needed.
Source: M Intelligence / SRDC educational exercise, 18 November 2026. Calculations derived from fictional assumptions. No observed client results. Independent of the other four exercises.
Claimed capacity must be compared with sustainable throughput at the same point, in the same units and over the same period.
With demand of 120 cartons/h and sustainable capacity of 100 cartons/h, the scenario covers only 83.3% of required throughput. The bottleneck must be addressed before committing to this capacity design.
The sensitivity changes one input only; all other assumptions remain constant.
The inputs above describe the initial scenario. The slider value and calculation below describe the sensitivity currently displayed.
Gap = 100 − 120 = −20 cartons/h. Shortfall / demand = 20 ÷ 120 = 16.7%. Throughput coverage = 100 ÷ 120 = 83.3%.Throughput coverage is not a customer service level. Queues, variability and rework are not modelled.
Verify the bottleneck and test the options: flow organisation, improvements to the existing process, additional capacity or phased investment.
Check the risk of queues and delays.
Size the resources or the alternative to the bottleneck.
Test peak-hour throughput, not an average.
Source: M Intelligence / SRDC educational exercise, 18 November 2026. Calculations derived from fictional assumptions. No observed client results. Independent of the other four exercises.
A target rate becomes a real gain only after checking cycle times, available hours and whether the gain can actually be used.
With constant headcount and hours, the projection at 105 units/h/operator produces 840 fewer units/day than the target at 120. The initial 20% gain becomes 5% in this exercise.
The sensitivity changes one input only; all other assumptions remain constant.
The inputs above describe the initial scenario. The slider value and calculation below describe the sensitivity currently displayed.
Reference = 8 × 7 × 100 = 5,600 units/day. Target = 6,720. Revised projection = 8 × 7 × 105 = 5,880. Gain = 5,880 ÷ 5,600 − 1 = 5%. Gap to target = −840 units/day.The seven hours are already net. Availability is not deducted a second time. These are not observed measurements.
Test the rate against the expected mix and connect the operational gain to a demonstrable economic effect. Do not automatically translate additional capacity into labour savings.
Monitor errors and rework alongside throughput.
Distinguish released capacity from cashable savings.
Include training and learning.
Source: M Intelligence / SRDC educational exercise, 18 November 2026. Calculations derived from fictional assumptions. No observed client results. Independent of the other four exercises.
A commissioning date does not mean that nominal capacity is immediately available. Continuity must be planned throughout the transition.
With start-up at 50%, followed by 70%, 85% and 100%, the first two months require additional cover. Full capacity is reached in Month 4 in the no-delay scenario.
The sensitivity changes one input only; all other assumptions remain constant.
The inputs above describe the initial scenario. The slider value and calculation below describe the sensitivity currently displayed.
M1: (6,000 − 4,000) × 20 = 40,000 units. M2: (6,000 − 5,600) × 20 = 8,000. Transitional cover required = 48,000 units. M3 capacity = 6,800/day, then M4 = 8,000/day.This volume requires cover; it does not represent lost sales. The new installation’s contribution is modelled separately; existing resources still need to be documented.
Plan transitional resources, cutover conditions and a delay scenario. Test the resources and cost of maintaining service before shutting down an existing system.
Maintain service during ramp-up.
Budget for transitional resources without double counting.
Link acceptance, training and the full-capacity date.
Source: M Intelligence / SRDC educational exercise, 18 November 2026. Calculations derived from fictional assumptions. No observed client results. Independent of the other four exercises.
Equipment is only part of the budget. Integration, transition and operating costs can change the comparison between options.
In this exercise, the budget rises from €1.95m to €2.35m after adding integration, training, a contingency reserve and additional maintenance. The gap is +20.5%.
The sensitivity changes one input only; all other assumptions remain constant.
The inputs above describe the initial scenario. The slider value and calculation below describe the sensitivity currently displayed.
Initial budget = 1,200,000 + 5 × 150,000 = €1,950,000. Completed = 1,950,000 + 150,000 + 50,000 + 100,000 + 5 × 20,000 = €2,350,000. Gap = +€400,000, or +20.5%.Undiscounted budget in constant euros, including the assumed contingency reserve. Tax, financing, working capital and residual value are not modelled. No investment return is established.
Complete the scope, then build incremental cash flows to compare the options. Benefits and financial conventions are required before calculating ROI, NPV or payback.
Link maintenance to operating continuity.
Compare over the same horizon and scope.
Distinguish initial, recurring and transitional costs.
Source: M Intelligence / SRDC educational exercise, 18 November 2026. Calculations derived from fictional assumptions. No observed client results. Independent of the other four exercises.
SSI Schaefer has announced an automated distribution centre in Trémery, managed by WAMAS. These figures describe the announced project; they do not demonstrate future performance.
Source: SSI Schaefer announcement, 9 November 2026 ↗, accessed 18 November 2026.
Our exploratory reading structures the H01–H05 questions: what volumes and mix, what sustainable peak throughput, which rates, what cutover plan and what total costs?
No client mandate or access to internal data. The simulations on this page are not Chaussea results. Public information helps frame the tests, not reach a GO or NO-GO conclusion.
Options are the possible decisions. Scenarios describe the conditions in which those decisions need to hold up.
Central assumptions supported by the available evidence.
Plausible, documented favourable conditions.
Plausible deterioration in volumes, gains, timing or costs.
An explicit disruption: prolonged shutdown, a change in mix or an unavailable dependency.
An investment decision, a business need or expertise to contribute.